    Have a good day, this is DEKE and welcome back to my channel, about the intelligent voice pedestrains prompt column and embedded traffic red green light's information that we have talked, if you still don't understand and have some questions, you can review the knowledge and leave message for us.


    Today, let's talk about when we install the intelligent voice pedestrains prompt column and embedded traffic red green signal light, what should we pay attention? In order to use the traffic signal light and protect pedestrains, drivers, it is important to install correctly, so that you can learn more about the products.


0.10


    The install time of intelligent voice pedestrains prompt column and embedded traffic red green signal light about need 2-3 days, it can be completely installed. After arriving at the installation site, the reflective road cone should be set up first. The installation location should be selected on both sides of the roadside crosswalk line. It is necessary to ensure that there is no light pole, guardrail, plant, etc. between the two warning posts to block the infrared ray, and there is no underground drainage ditch and other obstacles affecting the line.


    Sure good after installation location, in the selected point according to the distance between warning column line groove, about 1 cm width, depth of about 3 cm, tip column and pedestrian lights of their position if necessary also to line groove, the line between warning column connected and the two warning column on infrared launch window, the warning column with anchors fixed in the required level, each column 4 units.


b95bb4cc3feeb4dc179bd7a172a1721


    Burying the power cord between the warning column and the signal lamp. After checking the wiring, take the power from the signal lamp for testing, and observe the working conditions of red light, green light, text and voice prompt of the warning column. After the test is normal, first cut off the power, paste the line groove flat with cement, and tidy up the site. Switch on the power for the prompt column, and record the work after the normal operation of the equipment.